NPCC team - THE WALL - July05

The team from North Point was amazing with their heart to serve and their willingness to work REALLY hard and with crazy hours.  

What was accomplished: a 60 meter long, 2.5 meter high concrete wall, a large stone tablet floor was laid carefully by hand, then set, then poured cement into the joints, then scrapped away excess (wow!  very tedious work), painted a large building, laid a foundation for a for a warehouse!

BEFORE: the wall went up

BEFORE: a pre-wall view of the area

BEFORE THE WALL

Andy laying the footers for the wall

Concrete is flowing for the footers

Andy, Julian & Mitch working on footers for coner

All the guys working on the footers

Pouring and smoothing footers

Footers poured

Brooke helping wall crew by mixing concrete

1st Block laid (by Martin)

The wall is starting to take shape

Andy cutting up rebarb for the wall

Gordon and Julian cutting up

Mitch & Julian (Mixing the hard way)

Andy, Gordon & John Paul working on the columns

Katie & Andy cutting block

Wall Progress, about half way

Jerry mixing up some sand

Mauricio, looking things over

Andy & Katie throwing some block around

Steve working on the side wall (new master mason)

Side wall going up

Gordon (the foreman of the wall)

Andy wondering if he could knock down the wall

the guys laying the top level of the wall

Getting ready for top layer (wind & rain soon to come)

Working hard to get that concrete set

Fortino (Master wall builder), (Horizonte member)

Jose Luis (the master) wall builder (Horzinte member)

Fortino & Jose Luis (the real heros of the wall)

The wall going up strong

Julian & Jose Luis

The wall is almost up

Looking good

Almost

The wall...just about up

The wall looking good

Wow what a wall!

AFTER: the went up

 