BEFORE: the wall went up
|
|
|
|
BEFORE: a pre-wall view of the area
|
|
|
|
BEFORE THE WALL
|
|
|
|
Andy laying the footers for the wall
|
|
|
|
Concrete is flowing for the footers
|
|
|
|
|
Andy, Julian & Mitch working on footers for coner
|
|
|
|
All the guys working on the footers
|
|
|
|
Pouring and smoothing footers
|
|
|
|
Footers poured
|
|
|
|
Brooke helping wall crew by mixing concrete
|
|
|
|
|
1st Block laid (by Martin)
|
|
|
|
The wall is starting to take shape
|
|
|
|
Andy cutting up rebarb for the wall
|
|
|
|
Gordon and Julian cutting up
|
|
|
|
Mitch & Julian (Mixing the hard way)
|
|
|
|
|
Andy, Gordon & John Paul working on the columns
|
|
|
|
Katie & Andy cutting block
|
|
|
|
Wall Progress, about half way
|
|
|
|
Jerry mixing up some sand
|
|
|
|
Mauricio, looking things over
|
|
|
|
|
Andy & Katie throwing some block around
|
|
|
|
Steve working on the side wall (new master mason)
|
|
|
|
Side wall going up
|
|
|
|
Gordon (the foreman of the wall)
|
|
|
|
Andy wondering if he could knock down the wall
|
|
|
|
|
the guys laying the top level of the wall
|
|
|
|
Getting ready for top layer (wind & rain soon to come)
|
|
|
|
Working hard to get that concrete set
|
|
|
|
Fortino (Master wall builder), (Horizonte member)
|
|
|
|
Jose Luis (the master) wall builder (Horzinte member)
|
|
|
|
|
Fortino & Jose Luis (the real heros of the wall)
|
|
|
|
The wall going up strong
|
|
|
|
Julian & Jose Luis
|
|
|
|
The wall is almost up
|
|
|
|
Looking good
|
|
|
|
|
Almost
|
|
|
|
The wall...just about up
|
|
|
|
The wall looking good
|
|
|
|
Wow what a wall!
|
|
|
|
AFTER: the went up
|
|
|